Skip to content

Security & compliance

Access policy, personal-data protection under the PDPL, and alignment with the National Cybersecurity Authority controls and ISO 27001 — in one place an auditor can read.

Compliance posture
78
0100
out of 100 — assessed today
Data in the Kingdom100%No data transferred outside the Kingdom

Single sign-on (SSO)

Each entity with its own identity provider

  • Microsoft Entra ID
    Horizon Holding · 13 users
    Connected
  • Google Workspace
    Horizon Tech · 2 users
    Connected
  • SAML 2.0 — ADFS
    Horizon Logistics · 4 users
    Connected

Two-factor authentication

Allowed methods

Password policy

For break-glass and external accounts

Minimum length

Sessions

End the session after idle
Allowed networks for system admins
10.20.0.0/1610.30.0.0/16188.48.21.0/24