Liability cap at the fallback
Acceptable fallbackConfidence 84%12 months is acceptable as a fallback but below the preferred position.
Suggested fix as a tracked change· lowers the score by 5 points
Each party's aggregate liability shall not exceed the amounts paid in twelve (12) eighteen (18) months; the cap does not apply to fraud or a breach of confidentiality.